Help
How can we help?
Short pages on every Beedy tool: what it does, where to start, daily use, and what to do when you're stuck. OTIS answers from these same pages.
No page matches. Ask OTIS, or a person.Getting started
- What Beedy isBeedy builds the tools for the whole life of a plant: design it, train your operators on it, and run it with an AI operator assistant beside your crew.
- The four doors: which tool do I need?Start from what you are trying to do. Design, train, operate or plan: each need has one tool.
- A five-minute tour of the live plantOpen the Suite, watch a real upset on the demonstration plant, and see what moved first. No account needed.
Plant Management Suite
- Troubleshooting (Trend)Plot any signal, zoom into an incident, and see which signals left their normal pattern first. Add what the crew saw, and confirm or reject each lead.
- Process safety (PSM)Management of change, incident investigations, actions, process information, procedures and chemicals, under the standard you choose.
- ReportsDaily operations, permit compliance, incident and management KPI reports, under the regulatory profile of your plant, issued as numbered signed records.
- Shift log (Communications)Channels for the crew, mentions by role, and a shift handover filled from live plant data that the incoming shift acknowledges.
Beedy Simulator
- The MBR training plantA membrane bioreactor plant your trainee is allowed to break: control room, levers, twelve failure buttons, lab procedures, scored scenarios and OTIS.
- The aerated lagoonAn operator reference for aerated lagoons, with a season simulator: summer, winter and spring melt, one aeration lever, and six field scenarios.
- The re-refining plantA used-oil re-refining plant for operator training: system screens with loop faceplates, five scenarios, a laboratory and a 13-chapter academy.
Beedy Engineer
- Wastewater plant designSize a membrane bioreactor or a conventional activated sludge plant at the scoping stage: volumes, oxygen, membranes or clarifiers, equipment, energy, chemicals and sludge.
- Settling pond designSize a sediment pond from catchment, solids and storm data, check dam-safety consequence, route the storm, and produce a vendor RFQ package.
Polaris
- Polaris: crew planning for remote sitesPlan fly-in fly-out rotations, cover absences with ranked replacements, and export schedules. Each client gets its own space.
OTIS
- What OTIS does, and what he won'tOTIS is Beedy's AI operator assistant. He watches, explains and advises. People decide.
- Asking OTIS good questionsBe specific about the moment, the signal and what you want from him. He works best with what the page already shows.
Reference
- GlossaryPlain definitions of the process terms used in Beedy tools.
- Security and dataWhere Beedy tools run, what they store, what OTIS reads, and what runs on the server.
- Frequently asked questionsShort answers to the questions people ask first.
- Release notesWhat changed, and when.

A question about this page? OTIS answers from the help center and cites his sources.
Talk to a person