Free calculators for mining and mineral processing

17 mine and mill calculations: slurry, metallurgical balance, grinding, cyclones, thickeners and tailings. Formula shown, with practice problems.

Slurry and reagents

Percent solids from slurry density

FormulaCw = Gs × (Gm − 1) ÷ (Gm × (Gs − 1)) × 100  ·  Cv = (Gm − 1) ÷ (Gs − 1) × 100
Solids by mass (Cw)—%
Solids by volume (Cv)—%

Assumes water of SG 1.0 (correct it if the process water is very saline). With a pulp density scale, cut the full stream and weigh before the solids settle.

Slurry SG from percent solids

FormulaGm = 100 ÷ (Cw ÷ Gs + (100 − Cw))  ·  Cv = Cw × Gm ÷ Gs
%
Slurry specific gravity (Gm)—
Slurry density—kg/m³
Solids by volume (Cv)—%

Handy to set grinding dilution or check a density gauge. Ball mill discharge: often 65 to 75 % solids; flotation feed: 25 to 40 %.

Dry tonnage in a slurry line

FormulaCv = (Gm − 1) ÷ (Gs − 1)  ·  M = Q × Cv × Gs  ·  W = Q × (1 − Cv)
m³/h
Dry solids rate (M)—t/h
Water flow (W)—m³/h
Solids by mass (Cw)—%

This is the basis of a mass balance from a magnetic flowmeter and a nuclear density gauge. Check now and then against a sample weighing and the belt scale.

Dilution ratio and make-up water

FormulaD = (100 − Cw) ÷ Cw  ·  W = M × (D₂ − D₁)
t/h
%
%
Current dilution ratio (D₁)—t/t
Target dilution ratio (D₂)—t/t
Water to add (W)—m³/h

Dilution ratios (water/solids) add up; percent solids do not. A negative result means water must be removed (thickener, cyclone).

Reagent dose: g/t to solution flow

Formulag/min = M × d ÷ 60  ·  L/min = g/min ÷ Cs  ·  kg/d = M × d × 24 ÷ 1000
t/h
g/t
g/L
Active reagent used—kg/d
Solution flow—L/min
Solution flow—L/h

Flocculant: 10 to 40 g/t, stock solution often 0.25 to 0.5 % (2.5 to 5 g/L), then diluted in line. Collectors: a few g/t up to 100 g/t. Confirm the pump rate with a graduated-cylinder drawdown test.

Metallurgical balance and production

Two-product formula: recovery and ratio of concentration

FormulaC/F = (f − t) ÷ (c − t)  ·  R = c × (f − t) ÷ (f × (c − t)) × 100  ·  K = (c − t) ÷ (f − t)
%, g/t
%, g/t
%, g/t
Mass pull (C/F)—%
Recovery (R)—%
Ratio of concentration (K)—

Valid at steady state with samples taken at the same time. Works in % or g/t as long as all three grades use the same unit. Very sensitive to assay error when f is close to t.

Metal produced and concentrate tonnage

FormulaMe = T × f × R ÷ 10⁴  ·  Mc = Me ÷ c × 100  ·  Mt = T − Mc
t/d
%
%
%
Metal in concentrate (Me)—t/d
Concentrate produced (Mc)—t/d
Tailings to store (Mt)—t/d

For base metals (grades in %), in dry tonnes. For gold and silver in g/t, use the next calculator.

Gold or silver production (g/t)

FormulaAu = T × f × R ÷ 100  ·  oz = Au ÷ 31.1035
t/d
g/t
%
Metal recovered (Au)—g/d
Metal recovered (Au)—oz t/d

Troy ounce = 31.1035 g. Use the reconciled grade of the ore actually milled, not the resource model grade.

Stripping ratio (waste to ore)

FormulaSR = W ÷ O  ·  Σ = W + O
t
t
Stripping ratio (SR)—t/t
Total material moved (Σ)—t
Ore share—%

Can also be done in volume (bank m³): do not mix tonnes and m³. Compare with the break-even ratio of the mine plan.

Haul truck productivity

Formulatc = Σ tᵢ  ·  N = E ÷ tc  ·  Ph = P × N  ·  n = Pc ÷ Ph
t
min
min
min
min
min
min
t/h
Cycle time (tc)—min
Trips per hour (N)—/h
Production per truck (Ph)—t/h
Trucks required (n)—

Round n up to the next whole truck. Time the cycles in the field or take them from the dispatch system; 45 to 50 working minutes per hour is common.

Grinding and classification

Bond's law: grinding energy and power

FormulaW = 10 × Wi × (1 ÷ √P80 − 1 ÷ √F80)  ·  P = W × M
kWh/t
µm
µm
t/h
Specific energy (W)—kWh/t
Pinion power (P)—kW

Wi from a laboratory grindability test (ball mill). Rowland's efficiency factors (diameter, fineness, dry grinding…) are not applied: a first-order estimate.

Mill critical speed

FormulaNc = 42.3 ÷ √(D − d)  ·  %Nc = N ÷ Nc × 100
m
m
rpm
Critical speed (Nc)—rpm
Fraction of critical speed—%

Ball mills: about 65 to 80 %; AG and SAG mills: 70 to 80 %. Above about 85 % the charge starts to centrifuge and does less work. Set d = 0 for the simplified formula.

Circulating load from percent solids (cyclones)

FormulaD = (100 − C) ÷ C  ·  CL = (Do − Df) ÷ (Df − Du) × 100  ·  U = CL × M ÷ 100  ·  F = M + U
t/h
%
%
%
Circulating load (CL)—%
Cyclone underflow (dry)—t/h
Cyclone feed (dry)—t/h

Direct closed circuit: overflow equals new feed. Take the three samples at the same time; typical: 200 to 400 %.

Circulating load from a size fraction

FormulaCL = (f − o) ÷ (u − f) × 100  ·  U = CL × M ÷ 100  ·  F = M + U
t/h
%
%
%
Circulating load (CL)—%
Cyclone underflow (dry)—t/h
Cyclone feed (dry)—t/h

Pick a size where the three products differ clearly (e.g. % retained on 150 µm). More reliable than percent solids when dilution water varies.

Thickening, tailings and water

Thickener: underflow and recovered water

FormulaWf = M × (100 − Cf) ÷ Cf  ·  Wu = M × (100 − Cu) ÷ Cu  ·  Wo = Wf − Wu  ·  Qu = M ÷ Gs + Wu
t/h
%
%
Underflow flow (Qu)—m³/h
Underflow SG (Gu)—
Water recovered to overflow (Wo)—m³/h
Share of water recovered—%

Assumes a clear overflow (no solids) and water of SG 1.0. Watch overflow clarity: solids that report to overflow reduce the usable water.

Thickener: area, diameter and rise rate

FormulaA = M ÷ SL  ·  D = √(4 × A ÷ π)  ·  v = Qo ÷ A
t/h
t/m²·h
m³/h
Required area (A)—m²
Diameter (D)—m
Rise rate (v)—m/h

Solids loading comes from settling tests: about 0.05 to 0.3 t/m²·h for a conventional thickener, 0.5 to 1.5 for a high-rate thickener. Too high a rise rate gives a dirty overflow.

Tailings: storage volume and life

FormulaV = T ÷ ρd  ·  e = Gs ÷ ρd − 1  ·  Ww = V × e ÷ (1 + e)  ·  Y = Vs × 10⁶ ÷ (V × 365)
t/d
t/m³
Mm³
Volume per day (V)—m³/d
Volume per year—Mm³/yr
Remaining life (Y)—years
Void ratio (e)—
Water locked in voids, if saturated (Ww)—m³/d

Dry density depends on the deposition method and consolidation (often 1.2 to 1.6 t/m³ for slurry tailings, more for filtered tailings). Does not replace the deposition plan or the required freeboard.

Learning and checking tools. The ranges shown are general guidance: always follow your plant's procedures, permits and set points. Nothing is sent anywhere: the calculations run in your browser.